Tianjin TSX Steel Plank Shear Platform

  • 1000 - 1999 Pieces
    $10.00
  • >=2000 Pieces
    $8.00
Color:
silvery
Lead Time:
Quantity(Pieces) 1 - 1000 1001 - 2000 >2000
Est. Time(days) 21 30 Negotiable
Report Suspicious Activity
Overview
Quick Details
Type:
Steel Plank Shear Platform
Place of Origin:
Tianjin China (Mainland)
Brand Name:
TSX Group
Model Number:
Steel Plank Shear Platform
Name:
Tianjin TSX Steel Plank Shear Platform
Material:
Q195 / Q235 / Q345
Certificate:
ISO9001:2008/SGS
Thickness:
1.0-2.0 mm
Height:
38/45/50mm
Advantage::
High Strength
Width:
210/225/240/250/420/480/500mm
Length:
1m 1.5m 2m 3m 4m
Surface treatment:
Galvanized
Application:
Scaffolding System
Supply Ability
Supply Ability:
100000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Bundle, Bulk or as customer request Seaworthy package.
Port
Tianjin Port
Lead Time :
Quantity(Pieces) 1 - 1000 1001 - 2000 >2000
Est. Time(days) 21 30 To be negotiated
Product Description


Tianjin TSX Steel Plank Shear Platform


Place of Origin
Tianjin China (Mainland)
Size
more customized size available)
Length (mm)
1000mm
1500mm
2000mm
3000mm
4000mm
Width(mm)
210mm
240mm
300mm
420mm
480mmm/500mm
Height(mm)
38mm
45mm
50mm
Thickness(mm)
1.0mm
1.1mm
1.2mm
1.5mm
1.8mm/2.0mm
Material
Q195-Q235
Shape(Rib)
General Rib/V Stiffener /Square Stiffener
Good Market
Singapore ,Malyasia ,Middle East and Southeast Asia and all over the world
Cerification
ISO9001:2008 SGS etc
Surface Finishing
pre-galvanized (Zinc Coated :60g/ square meter)
Technique
automatic productive assembly line
MOQ(Minimum Order Quantity)
500pcs
Payment
L/C at sight ;T/T 30% deposit
Package
packed in bulk or in bundle. shipped by container or as client's request
Production Capacity
100000pcs/month
Applications of scaffolding planks in construction:
1.Scaffolding plank is the main parts of scaffolding system which is convenient for workers to walk on high building.
2.Stamping holes are on the scaffolding plank to resist skidding for workers.
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and most environment.
4. Various size of scaffolding plank could be customed.
Advantage of scaffolding planks used for construction:
1.durable & stable 
2.good bearing capacity
3.low cost, high quality
4.Excellent security function
5.easy to assemble & dismantle
6.long durability, the working life can up to 5-8 years
 7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight
Detailed Images
Production Process

Certificates


Packing & Delivery
Certifications
Our Company
Related Products
Contact us