TSX-MP2299 Q345 ringlock scaffold with steel catwalk/steel plank/scaffolding ringlock system

FOB Reference Price:Get Latest Price
US $8-20 / Pieces | 500 Piece/Pieces (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Tianjin, China (Mainland)
Brand Name:
TSX
Model Number:
TSX-MP2299 Q345 ringlock scaffold with steel catwalk/steel plank
Feature:
Corrode-resistant ,slip prevention,anti-fire,anti-sand,less weight
Advantage:
durable & stable ,good bearing capacity
Function:
Excellent Security Function
Technical vantages:
easy to assemble & dismantle
Durability:
long durability,
Stamping holes:
resist skidding
galvanized surface:
more stronger in the rainy days
moist environment.:
Various size of scaffolding plank could be customed
Other Name:
scaffolding planks
Weight:
easy to carrying
Supply Ability
Supply Ability:
100000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
TSX-MP2299 Q345 ringlock scaffold with steel catwalk/steel plank/scaffolding ringlock system packed in bulk or in bundle. shipped by container or as client's request
Port
Tianjin
Lead Time :
15-30 days after deposit
Product Description

 TSX-MP2299 Q345 ringlock scaffold with steel catwalk/steel plank/scaffolding ringlock system 

NameMetal Deck /Decking /Plank /Walk Board
Place of OriginTianjin, China (Mainland)
Sizemore customized size available)
Length (mm)1000mmm1500mm2000mm3000mm4000mm
Width (mm)210mm240mm300mm420mm480mm/500mm
Height(mm)38mm45mm50mm  
Thickness(mm)1.0mm1.1mm1.2mm1.5mm1.8mm/2.0mm
Shape(Rib)General RibV Stiffener   
MaterialQ195-Q235
Good MarketSingapore ,Malyasia ,Middle East and Southeast Asia and all over the world
CerificationISO9001:2008,SGS etc.
Surface Finishingpre-galvanized (Zinc Coated :60g/ square meter)
Techniqueautomatic productive assembly line
MOQ(Minimum Order Quantity)500       pcs
PaymentL/C at sight ;T/T 30% deposit.
Packagepacked in bulk or in bundle. shipped by container or as client's request
Production Capacity100000 pcs / month

 

Applications of scaffolding planks in construction:
1.Scaffolding plank is the main parts of scaffolding system which is convenient for workers to walk on high building.
2.Stamping holes are on the scaffolding plank to resist skidding for workers.
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and most environment.
4. Various size of scaffolding plank could be customed.

 

Advantage of scaffolding planks used for construction:
1.durable & stable 
2.good bearing capacity
3.low cost, high quality
4.Excellent security function
5.easy to assemble & dismantle
6.long durability, the working life can up to 5-8 years
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight

 

 

 

QQ20151014103719.jpg

 

 

 QQ20151014103712.jpg

 

 

 

Packaging & Shipping

 

 

QQ20151014103727.jpg

 

Company Information

Company Brief Introduction:TSX Groupe was founded in 2000,it locates in Tianjin Jinghai County, Da Qiu Zhuang industrial estate. It is a collection of production building steel pipe,adjustable steel prop,ringlock scaffold,  scaffold,H frame scaffold, adjustable base and various accessories professional manufacturer.Our products sell well both at home and abroad.Exported to easted Europe,Middle East,south Asia and many other countries and regions.

Why choose us:

  1. We are a professional manufacturer with 16 years experiences.
  2. Our group covers an area of 37000sqm,more than 180 high quality technology employees include 6 engineers.
  3. We have 6 fully automatic welding production line.High production strength so that the annual output of more than 2 million sets.
  4. We can assure you the delivery time.
  5. Our group are certified by ISO,API and etc.
  6. Good after-sales service,no dispute
FAQ

- - - 1. Q: What's your MOQ(minimum order quantity)?

A: One full 20ft container,mixed acceptable .

- - - 2. Q: What's your packing methods?

A: Packed in bundle or bulk (customed is accepted).

- - - 3. Q: What's your payment terms?

T/T 30% in advance by T/T ,70% will be before shipment under FOB.

T/T 30% in advance by T/T ,70% against the copy of BL under CIF.

T/T 30% in advance by T/T ,70% LC at sight under CIF.

- - - 4. Q: What's your delivery time?

A: 10-20 days after received the advance payment .

- - - 5. Q: Are you manufacturer or trader?

A: We are the manufacturer of construction materials for decade years ,TSX Group do domestic market and export business.

- - - 6. Q: Where's your factory?

A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.

- - - 7. Q: Can we visit your factory?

A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

- - - 8. Q: Can you supply other scaffolding materials?

A: Yes. All related construction materials.

(1) scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)

(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139

(3) steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)

(4) steel coupler (pressed/drop forged coupler)

(5) steel plank with hooks or without hooks

(6) steel stair case

(7) screw adjustable base jack

(8) Construction Metal Formwork

 

Related products
Contact Us
Back To Home