Scaffolding steel plank/walk board/catwalk with hook

FOB Reference Price:Get Latest Price
$9.00 - $18.00 / Piece | 500 Piece/Pieces (Min. Order)
Color:
SIlver
Lead Time:
Quantity(Pieces) 1 - 1 2 - 100 101 - 500 >500
Est. Time(days) 7 15 21 Negotiable
Customization:
Customized logo (Min. Order: 200 Pieces)
Customized packaging (Min. Order: 200 Pieces)

More

Graphic customization (Min. Order: 200 Pieces) Less
Samples:
$50.00 /Piece | 1 Piece (Min. Order) | Buy Samples
Report Suspicious Activity
Overview
Quick Details
Type:
Steel plank
Warranty:
1 YEAR
After-sale Service:
Online Technical Support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts
Project Solution Capability:
NONE
Place of Origin:
Tianjin, China
Brand Name:
TSX
Model Number:
ASP-199
Product name:
Scaffolding steel plank/walk board/catwalk with hook
Advantage:
durable & stable ,good bearing capacity
Function:
Excellent Security Function
Technical vantages:
easy to assemble & dismantle
Durability:
long durability
Stamping holes:
resist skidding
galvanized surface:
Pre-galvanized
moist environment.:
Various size of scaffolding plank could be customed
Other Name:
scaffolding planks with hooks
Weight:
easy to carrying
Supply Ability
Supply Ability:
100000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Seaworthy standard package
Port
Tianjin
Picture Example:
package-img
Lead Time :
Quantity(Pieces) 1 - 1 2 - 100 101 - 500 >500
Est. Time(days) 7 15 21 To be negotiated

Scaffolding steel plank/walk board/catwalk with hook

Product Description

 

NameMetal Deck /Decking /Plank /Walk Board
Place of OriginTianjin, China (Mainland)
Sizemore customized size available)
Length (mm)1000mmm1500mm2000mm3000mm4000mm
Width (mm)210mm240mm300mm420mm480mm/500mm
Height(mm)38mm45mm50mm 45mm 45/50mm
Thickness(mm)1.0mm1.1mm1.2mm1.5mm1.8mm/2.0mm
Shape(Rib)General RibV Stiffener Square V Stiffener  
MaterialQ195-Q235
Good MarketSingapore ,Malyasia ,Middle East and Southeast Asia and all over the world
CerificationISO9001:2008,SGS etc.
Surface Finishingpre-galvanized (Zinc Coated :60g/ square meter)
Techniqueautomatic productive assembly line
MOQ(Minimum Order Quantity)500       pcs
PaymentL/C at sight ;T/T 30% deposit.
Packagepacked in bulk or in bundle. shipped by container or as client's request
Production Capacity100000 pcs / month

 

Applications of scaffolding planks in construction:
1.Scaffolding plank is the main parts of scaffolding system which is convenient for workers to walk on high building.
2.Stamping holes are on the scaffolding plank to resist skidding for workers.
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and most environment.
4. Various size of scaffolding plank could be customed.

 

Advantage of scaffolding planks used for construction:
1.durable & stable 
2.good bearing capacity
3.low cost, high quality
4.Excellent security function
5.easy to assemble & dismantle
6.long durability, the working life can up to 5-8 years
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight

 

 

 

 

 

 

 

 

 

Packing & Shipping

 

Company Information
Produce Process

 

 

 

 

 

 

 

 

 

FAQ

- - - 1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .
- - - 2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).
- - - 3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
- - - 4. Q: What's your delivery time?
A: 15-28 days after received the advance payment .
- - - 5. Q: Are you manufacturer or trader?
A: We are the manufacturer of construction materials for decade years ,TSX Group do domestic market and export business.
- - - 6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
- - - 7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
- - - 8. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1) Scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139
(3) Steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) Steel coupler (pressed/drop forged coupler)
(5) Steel plank with hooks or without hooks
(6) Steel stair case
(7) Screw adjustable base jack
(8) Construction Metal Formwork

Related products
Contact Us
If you want more details,pls contact us
 
Contact : Candy Dong
 

Mobile/Whatspp/Wechat:+86 17695670807

E-Mail: candy(@)tjtsxgroupe.com

Homepage: www.tsxgroupe.com